Permits & Inspections

This page explains the permits and inspections required by Unified Alaskan Utilities for water service connections, modifications, and repairs. These requirements ensure safe connections, maintain water quality, and comply with Alaska regulations.

Service Connection Permits

When You Need a Permit

You must obtain a connection permit from Unified Alaskan Utilities before you:

  • Install a new service connection
  • Repair or modify an existing service connection
  • Remove or disconnect a service connection
  • Extend a service connection

Important: No person may connect to any utility facility without first obtaining a permit from the utility.

How to Get a Connection Permit

  1. Download the Permit Form: Service Connection Permit Forms
  2. Complete the Application with property and project information
  3. Submit Required Plans (if applicable for multi-family or commercial projects)
  4. Pay Permit Fee: $95.00

What’s Included in Your Permit Fee

The service connection deposit (paid upfront) covers:

  • Connection permit fee: $95.00
  • Plan review fee (if required): $190.00
  • Inspection fees
  • Other utility costs

Required Plans (Multi-Family or Commercial Projects)

For multi-family dwellings or commercial structures, you must submit four (4) copies of engineered plans signed and stamped by a professional engineer registered in Alaska. Plans must include:

  • Invert and ground surface elevations at the main and building foundation
  • Type, class, and diameter of pipe used
  • Depth of bury and separation from other utilities
  • Location and intended use of each structure
  • Vicinity map, legal description, north arrow, and scale
  • Existing street names and proposed connection locations
  • Engineer’s firm name, address, and phone number

Plans must conform to UAU design standards:

Required Inspections

When Inspections Are Required

All service connections and extensions must be inspected by the utility before backfilling. Inspections are required for:

  • New service connection installation
  • Service connection repairs or modifications
  • Service extension installation (from keybox to building)
  • Service connection removal or disconnection

Critical: No service connection or extension may be covered with dirt until it has been inspected and approved by the utility.

How to Schedule an Inspection

You must schedule at least 24 hours in advance, excluding:

  • Weekends
  • Holidays
  • Hours between 4:00 PM and 8:30 AM

Call to schedule:

  • (907) 222-4084
  • (855) 790-4084

You or your representative must be present at the scheduled inspection time. If you are not present, the utility representative will leave a notice and you will be charged a $122.00 return visit fee.

Inspection Fees

Connection SizeFee
3/4" to 2"$122.00 per inspection
Larger than 2"$300.00 deposit

Re-Inspections

If your connection fails inspection, it must be corrected and re-inspected. You will pay the full inspection fee for each re-inspection, or actual costs if higher.

If You Skip Inspection

If you backfill without an inspection, the utility may require you to excavate the connection again at your expense to prove it meets requirements.

Record Drawings Required

After installation, you must submit drawings showing the exact location of your service connection and/or service extension.

For multi-family or commercial buildings, these drawings must be signed and stamped by a professional engineer registered in Alaska who certifies they inspected the work during construction.

The utility may not turn on your water service until these drawings are reviewed and approved.

New Home Connections

For complete information about connecting a new home or building to water service, see our New Home Connections page.

Cross-Connection Control and Backflow Prevention

What is a Cross-Connection?

A cross-connection is any connection (physical or otherwise) between the utility’s potable water supply and any non-potable water source that could allow contamination to enter the water system.

Cross-Connection Control Program

The utility identifies cross-connection risks for each service connection. Some connections require installation of one or more backflow prevention devices and assemblies.

Annual Testing and Fees

If you are required to maintain backflow prevention devices, you will be charged an annual administration fee of $25.00 per backflow prevention assembly.

The utility is responsible for:

  • Determining the need for backflow prevention devices
  • Approving installation
  • Initial testing of devices
  • Requiring periodic testing and reporting of test results

Property Owner Responsibilities

If required to have backflow prevention devices, you must:

  • Allow utility representatives to enter your property at reasonable hours for random testing and inspection
  • Maintain the devices in working order
  • Have them tested periodically as required by the utility
  • Submit test results to the utility

Service Disconnection

Water service may be disconnected if:

  • A required backflow prevention device has not been installed
  • The device has not been tested and maintained
  • The device has been removed or bypassed
  • An unprotected cross-connection exists on the premises

Service will not be restored until conditions are corrected in compliance with the tariff and Uniform Plumbing Code.

Prohibited Connections

You cannot connect utility water facilities (or any customer-owned water facility connected to utility water) to:

  • Any other water source (including private wells)
  • Any source of possible water contamination (including fire sprinkler systems or reservoir structures)

The utility will deny or disconnect service if another water source is connected.

Limited Exceptions:

  • Hospitals, health clinics, and federal facilities may be approved for standby service with proper backflow prevention devices
  • Fire sprinkler systems may be connected if properly pressure tested and chlorinated in the presence of a utility representative

Design Standards and Installation Requirements

All service connections and extensions must meet current UAU design standards, Uniform Plumbing Code and local amendments, and Alaska state statutes and regulations.

Required Standards Documents

For detailed specifications, approved materials, prohibited materials, joining methods, and installation requirements:

  • Residential Service Extension Standard - Standards for residential service connections including keybox configuration, approved materials (plastic-coated Type K copper, HDPE), prohibited materials (PVC, uncoated copper, galvanized steel), and approved joining methods

  • Main Service Connections Standard - Standards for larger service connections with approved materials and connection methods

  • Trenching & Insulation Standard - Requirements for minimum burial depth, insulation requirements based on location (paved vs. unpaved areas), backfill specifications, and Alaska-specific frost protection

Who Can Perform Work

  • Physical Connection to Main: Only the utility or utility’s authorized representative can make the physical connection to the water main
  • Service Extensions: Licensed plumbers for customer-side work (from keybox to building)
  • All Work: Must be performed in accordance with utility specifications and standards

Meter Requirements

Installation and Location

  • Meters must be installed in a utility-approved location
  • Meters must be protected from freezing and physical damage
  • Meters must remain accessible year-round for reading and maintenance
  • The utility provides and owns the meter; the customer is responsible for protecting it from damage

Meter Tampering Prohibited

Customers may not connect to, interfere with, or alter meters, valves, bypasses, keyboxes, or other utility facilities. Violations may result in:

  • Service disconnection
  • Charges for damage to utility facilities
  • Billing for estimated usage during tampering period

Contact Us

To request permits, schedule inspections, or discuss requirements:

Phone:

  • (907) 222-4084
  • (855) 790-4084 (Toll Free)

Email:

Mailing Address:

  • P.O. Box 233368
  • Anchorage, AK 99523-3368

Business Hours:

  • Monday - Friday: 8:00 AM - 5:00 PM (Alaska Time)
  • Closed weekends and holidays

Inspection Scheduling: You must schedule inspections at least 24 hours in advance, excluding weekends, holidays, and hours between 4:00 PM and 8:30 AM.

Forms and Standards:


All service connections and extensions must be inspected before backfilling. Proper permits and inspections protect water quality and ensure safe, compliant installations.