Can I get temporary water for construction?
Service Changes & Property Transfers
Yes. Temporary construction water service is available for uninhabited properties under construction at $104.52 per month, with possible meter requirement.
Temporary construction water service provides water to properties where multi-family dwellings or commercial structures are under construction but not yet inhabited or operational.
Eligibility:
- Property where building is under construction
- Multi-family dwelling or commercial structure
- Not yet inhabited
- Not yet being utilized as a commercial structure
- Must have existing approved water main and service connection
Rate:
- Monthly charge: $104.52 (Section W-027.14)
- Plus Regulatory Cost Charge (0.569% of billing)
- Flat monthly fee regardless of usage (unless metered)
Application requirements:
- Submit application for water service per Section W-006
- Provide all required information:
- Full name and contact information
- Legal description of property
- Construction details
- Expected duration of construction
- Pay service deposit
Service deposit: Required deposit based on:
- Two months of estimated temporary construction charges, or
- Two months of metered charges if meter required
- Refunded upon service discontinuation minus any charges owed
Meter and backflow requirements: At the utility’s discretion:
- May require appropriately sized water meter
- May require backflow prevention device
- If metered, billed at applicable metered rates instead of flat $104.52
- Customer installs any meters or backflow prevention devices at own expense per utility specifications
Important restrictions:
- Can ONLY be used for the parcel under construction
- Cannot provide water to any other lot or location
- Violation may result in immediate service disconnection
- May face penalties for unauthorized use
Duration:
- Service provided throughout construction period
- Must convert to regular service when construction complete
- Cannot continue temporary construction rate after occupancy
- Must notify utility when building becomes inhabited/operational
Transition to permanent service: When construction is complete:
- Apply for permanent service
- Temporary construction service ends
- Convert to appropriate rate schedule:
- Residential rates for multi-family dwelling
- Commercial rates for commercial structure
- Likely metered service required for multi-family/commercial
Inspections required:
- All new service connections must be inspected
- Cannot backfill without utility approval
- May require multiple inspections during construction
- Standard inspection fees apply ($122)
- See the Permits & Inspections page for more details
Tariff Reference: Section W-023-C, Section W-027.14, Section W-006